Thursday, May 21, 2009

Good News on Floors

Matt:

Dimensions of all the electronic equipment was noted. Everything should fit. The size of the sliding mechanism was taken into account and the size of the future Blue Ray disc player. The will be very little space remaining (about 1 ½” to 2” at the most).

The flooring installer was able to move us up in his schedule. He is coming out this week to do a visual, and will be starting next week the 27th, 28th, and 29th. I have advised Phyllis of the change in flooring installation so she can plan to work around him if she is not finished by next week Wednesday.

We will wait until after the flooring is installed to do the finish electrical, reinstallation of heating units, floor trim boards, etc. Greg is on vacation in Mexico the week of the flooring installation. He will construct and install the TV components when he returns. The sliding gizmo will not be here until next week, so he won’t be able to make it before he goes on vacation.

I think that is all for now.

Regards,

Jill